The bonnet area is now cleared for fuel tank to be relocated.

The junk removed from the bonnet area.

A electric washer pump now replaces old VW system air from spare tyre.

Some change to the dash out goes the old speedo and seperate fuel guage.
needs complete rework not ergonomic

New rear lights
Engine work twin carbs electronic ignition petronix coil and leads (super fat spark)

Next job relocation of pump and tank
wtg on tank dimension
020806
MOT passed just a few odds and ends like fan belt guard and some suspension bits added.
Gas KYBs for the rear.
Alternator tested ready for install.
alot of stuff is wating on welder at the moment.
to pass the time slowly stripping and degunking frame and engine bits
next update due 30-09-06
Been busy on other things. but rear wings to go to replace ugly steel ones.
Later Steering column. VW handbrake
Dash re-design.
next update due 30-12-2006
next update due 30-03-2007